Cave

Country Date, Event Failures
2 0 0 7

1

Sveta Jama Slovenia 2007 May - design and installation of a mobile lighting system based on LED lights. no
2 0 0 8
2 Badsegeberger Kalkberghöhle Germany 2008, June - Installation and Programming lighting. Equipment - OK
rock fall cable damaged
3 Atta Höhle Germany 2008 September - test equipment Cave Lighting. The first installation of floodlights QP. customer mistake – short cut
4 Herbstlabyrinth Germany 2008 July - beginning of construction works (Only LED-light and FRP-constructions), Installation
February 2009 – end of the works in the cave.
Equipment – OK
(mechanical and electrical)
Low quality generator.
2 0 0 9
5 Balcarka Jeskyne Czech republic 2009, May – Installation LED lighting project room "Big Dome" Equipment – OK
(mechanical and electrical)
Problems with cable connectors in PR.
6 Dechenhöhle Germany 2009 October - Installation at Cave at "Cathedral". 2010 February. Installation of equipment in the next part of the cave. Equipment – OK
(mechanical and electrical)
Problems with remote controls Lynx.
7 La Pierre-Saint-Martin France 2009 July – Installation LED lamps LQP. Equipment – OK
(mechanical and electrical)
8 Barbarossahöhle Germany 2009 September – Installation underwater LED light. Equipment – OK
(mechanical and electrical)
9 Hermannshöhle Germany 2009, March - Installation LED Cave Lighting Equipment for White corridor. Equipment – OK
(mechanical and electrical)
Bad installation.
2 0 1 0
10 Grotte Clamouse France February 2010. Planning, Installation and Supervising. LED Lighting System. Equipment – OK
(mechanical and electrical)
11 Postojnska jama Slovenia 2010 February - Installation of LED Cave Lighting Equipment. Equipment – OK
(mechanical and electrical)
12 La Grotte de Remouchamps Belgium March 2010.Planning and Installation LED lighting system in “Cathedral Hall”. Equipment – OK
(mechanical and electrical)
13 Wendelsteinhöhle Germany April 2010. Planning and Installation of electrical equipment in the cave. Equipment – OK
(mechanical and electrical)
14 Kumistavi(Tskaltubo) cave Georgia March 2010 Preparation of the project documentation.
Oct. 2010 Begin of the complete Installation of 1200m Show Cave
Equipment – OK
(mechanical and electrical)
15 Sontheimer Höhle Germany August 2010. Planning and Installation LED Lighting System. Equipment – OK
(mechanical and electrical)
Martens on cable
16 Pestera din Valea Fundata cave Romania October 2010. Planning, Installation and Programming LED Lighting System. Equipment – OK
(mechanical and electrical)
2 0 1 1
17 Kumistavi(Tskaltubo) cave Georgia Till April 2011 Complete Installation of 1200m Show Cave. Programming job for Sound-Light Show. Equipment – OK
(mechanical and electrical)
18 Schaubergwerk Hochfeld Austria Project Planning 2010. Installation of equipment in April-May 2011. Equipment – OK
(mechanical and electrical)
19 Kasematten Dillenburg Germany June 2011, Planning and Installation of equipment. Equipment – OK
(mechanical and electrical)
Thunderstorm
20 Charlottenhöhle Germany August 2011, Planning and Installation of equipment in the cave. Equipment – OK
(mechanical and electrical)
Martens on cable
21 Underground Monastery Divnogorie Russia March 2011. Planning and Installation LED Lighting System. Equipment – OK
(mechanical and electrical)
Problems with remote controls Lynx.
2 0 1 2
22 Höllgrotten Baar Switzerland Planning and Installation November 2011- February 2012 Equipment – OK
(mechanical and electrical)
23 Heinrichshöhle Germany Planning and Installation / Part Installation February 2012. Easy lighting system incl. implementation into existing switching control. Equipment – OK
(mechanical and electrical)
24 Mine / Grube “Hella Glück" Germany Planning and installation January 2012. Easy lighting system. Equipment – OK
(mechanical and electrical)
25 Sophienhöhle Germany Planning and installation February – March 2012. Complicated system with island multimedia shows and Cave Lighting controls. Equipment – OK
(mechanical and electrical)
DMX problems
26 Grotte de Han / Les Draperies Belgium Planning and installation of Cave Lighting system in the hall Draperies. Full controllable system with remote control. April – June 2012 Equipment – OK
(mechanical and electrical)
27 Postojnska Jama Slovenia Planning and test installation of Cave Lighting system in the gallery Lepa Jama. Fullcontrollable system with button control. Full DMX programming. Mai 2012. Equipment – OK
(mechanical and electrical)
28 Eisriesenwelt / Tunnel Austria Planning and installation of lighting equipment in the tunnel on the way to Eisriesenwelt cave. New lighting concept. June 2012. Equipment – OK
(mechanical and electrical)
Thunderstorm
29 Scarisoara Romania Ice cave. Planning and installation of Cave Lighting system. Full controllable system with remote control. February 2012 Equipment – OK
(mechanical and electrical)
30 Farcu cave Romania Planning and installation of Cave Lighting system and FRP path way.. Full controllable system with remote control. June 2012. Equipment – OK
(mechanical and electrical)
31 Teufelshöhle Steinau Germany
Steinau a.d. Strasse
Planning and installation.
LED lighting system 24V.
August – September 2012
Equipment – OK
(mechanical and electrical)
32 Iberger Tropfsteinhöhle Germany
Bad Grund
Planning and installation.
LED lighting system 24V.
Complex lighting system: PWM and DMX full control.
Special concept of guided tour.
November – December 2012
Equipment – OK
Some troubles with installation of magnetic switches.
2 0 1 3
33 Schillat Höhle Germany
Hessisch Oldendorf
Planning and installation of LED lighting system 24V.
Easy system with 3 main lighting zones and mechanical switching points.
Because of low budget no control system.
February 2013
Equipment – OK
34 Kubacher Kristallhöhle Germany
Weilburg
Producing of material and lighting tests.
Installation by the cave club with the help of Cave Lighting project specialists.
Easy system with different lighting zones. Implementation into old lighting system.
December 2012 – march 2013
Equipment – OK
35 Lamprechtsofen Austria Entrance area of cave. Installation of Power box, way lighting and artistic lighting.
Mai – Juni 2013
Equipment OK,
Problems with overvoltage protection. Additional changes in PBs.
36 Eisriesenwelt / Entrance area Austria LED lighting for area in front of cave entrance. Special lighting for cave toilette and sitting room.
Juni 2013
Equipment – OK
37 Höllgrotten Switzerland LED light and music show. “Feuerrot und Himmelblau”.
150 years Höllgrotten cave.
April 2013
Equipment – OK
38 Is Zuddas Italy/ Sardinia LED lighting in Salle delle Eccentriche. Pathway + main lighting system with separate circuits and analog switching.
November 2013
Equipment – OK
39 Punkevni Jeskyne Czech republic Complete planning and installation of LED lighting system in Masarikuv Dom. Dynamic lighting with different switching possibilities. Equipment – OK
2 0 1 4
40 Syrauer Drachenhöhle Germany Complete reconstruction of lighting system in the cave.
December 13– January 14.
New lighting system combined with FX network and magnetic switching.
Equipment – OK
41 Erdmannshöhle Germany Complete reconstruction of lighting system and pathways in the cave. New LED lighting system incl. dynamic light and light + music shows. FRP hand rails, stairs and bridges.
February – April 2014
Equipment – OK
42 Heinrichshöhle Germany Planning and Installation / Complete Installation. Easy lighting system incl. implementation into existing switching control.
March 2014
Equipment – OK
(mechanical and electrical)
43 Veledahöhle Germany New FRP construction. Stairs and pathway for the first 60 meters in how cave. Complete FRP – construction.
May – July 2014
Equipment – OK
44 Lamprechtsofen Austria 2. Step of installation. Installation of Power box, way lighting and artistic lighting in the Stainer Hall.
Mai 2014
Equipment – OK
45 Grotte di Villanova Italy Installation and programming of LED lighting system in the new touristic part. Using of new Cave Lighting control units and Cave Scenes software.
April July 2014
Equipment – OK
46 Lurgrotte Semriah Austria Planning and installation of LED lighting system in the biggest hall of cave: Großer Dom hall.
May 2014 - today
Equipment – OK
47 Kluterthöhle Germany Step 1. Planning and installation of LED lighting system include DMX show in the Back Part of the show cave.
September – October 2014
Installation in process
48 Dechenhöhle Germany Complete renewal of lighting system in Dechen cave.
November 2014 February 2015
in preparation